I haven?t completed my -8 so thought I would do the SB 14-01-31 before I installed the tail. I got the kit for it and the rivet call out for riveting the doublers to the front spar instructs you to use the AN470AD4-7 in some places and AN470AD4-5 in other places. In setting either one of these rivets I found that if I set it just far enough so the hole in the end of the rivet gage (purchased from AC vendor) would just fit over the shop head, the other end wouldn?t even come close to sliding over the shop head. If I set it far enough so that end would just slide over the shop head, then the other end wouldn?t come close to fitting over the shop head. So I set a few rivets so the hole in the one end of the gage almost fits over the shop head and the other end almost slides over the shop head. Is this acceptable? If not, then what? Thanks