Doug Rohrer
Well Known Member
I am nearing the point I need to assemble the wheels, tires, brakes, pants, etc. on my RV-9A build. I am waiting on panel stuff, and don't want to put the fuse up on the gear until after I am done with wiring. I like having the fuse on a low sawhorse for that. Is there any reason I can't do the main gear assembly by clamping the gear leg in a vise and working on it upside down? Any watch-outs?