Hello,
I am on section 9-5 and I having problems getting the E-905 root rib for the elevator to align properly with the skin and the E-1002 spar. I have tried several different configurations, swapping parts and it appears the dimensions are just off. I have the other E-1008s in place and they line up extremely well with the spar and skins. I find this as additional validation that the skins and spar are properly assembled. I stepped away but will go back down in the shop and double check everything again.
I can get one cleco in the spar ( middle cleco) and then bend the 905 to align to the skins but then the E-905 rib is not aligned properly with the remaining holes (top and bottom) of the spar and the skin holes would probably be way off on the top skin.
It is probably something silly because so far everything is so well designed. Help me figure it out please.
I have attached a picture
http://elstien.us/RV-10 Build Log and Information/Picture Albums/Elevator/FullSizeRender.jpg
I am on section 9-5 and I having problems getting the E-905 root rib for the elevator to align properly with the skin and the E-1002 spar. I have tried several different configurations, swapping parts and it appears the dimensions are just off. I have the other E-1008s in place and they line up extremely well with the spar and skins. I find this as additional validation that the skins and spar are properly assembled. I stepped away but will go back down in the shop and double check everything again.
I can get one cleco in the spar ( middle cleco) and then bend the 905 to align to the skins but then the E-905 rib is not aligned properly with the remaining holes (top and bottom) of the spar and the skin holes would probably be way off on the top skin.
It is probably something silly because so far everything is so well designed. Help me figure it out please.
I have attached a picture
http://elstien.us/RV-10 Build Log and Information/Picture Albums/Elevator/FullSizeRender.jpg