I am working on cabin top fitting and plan to install MC seals. However, I won't get my doors for another month or so. While working on the top, I would like to start trimming back the door flange to a good starting point. I don't plan to take any width off until I have doors installed, but would like to trim to length. I have reviewed Ivan's site and it looks like he used 1" of flange as measured from the flat surface of the door opening.
I was hoping to get some guidance from the group so I don't have to wait for doors to do this.
EDIT: After thinking some more, maybe it makes more sense to first trim to the 1/4" clearance. This might make it easier to fill in epoxy later.
Larry
I was hoping to get some guidance from the group so I don't have to wait for doors to do this.
EDIT: After thinking some more, maybe it makes more sense to first trim to the 1/4" clearance. This might make it easier to fill in epoxy later.
Larry
Last edited: