I'm contemplating starting a -4 or -8, and I'm curious as to how much of the build I could do in a basement. I don't have directly outside access (other than through a window), and going upstairs requires 2 90* turns (top and bottom of stairs). Any chance I could do any substantial part of the work down there so as to save 1/2 of my garage?