Had enough with my grass strip being soft from the growth of moss. It holds the moisture and the soil stays wet all the time. I have two choices, one kill the moss and grass and start over. With this option I know five to seven years I will have to re-do again. Second is to remove the sod and top soil and install class A gravel. A friend used Class A gravel and seeded it. His is firm and from a short distance you would not know it was gravel.
I'm wandering if 30 feet of gravel would do for me with soft sod on both sides much wider. My strip is probably 150 feet wide now.
Any thought would be appreciated, and I know width depends on proficiency. Joe in Maryland had us land on a 35'X6000' paved runway back when we did transition training in the 10 to see if we could stay centered and even in transition training 35' was not an issue.
I'm wandering if 30 feet of gravel would do for me with soft sod on both sides much wider. My strip is probably 150 feet wide now.
Any thought would be appreciated, and I know width depends on proficiency. Joe in Maryland had us land on a 35'X6000' paved runway back when we did transition training in the 10 to see if we could stay centered and even in transition training 35' was not an issue.