  #71  
Old 06-30-2017, 12:34 PM
RV7ForMe RV7ForMe is online now
 
Join Date: Jul 2015
Location: Europe
Posts: 274
Arrow #41

Between post #40 and #41 I took a break from building. Next thing on the to do list was roll the leading edges of the rudder and elevators. I needed a edge breaking tool. I had ordered one of the nylon roller type and it just never made to me. Since every order I make of these "special" tools usually come from the USA and it takes a few weeks I had was kind of out of things to do.

Eventually I asked a follow builder if I could borrow a few things to finish the empenage kit. But with busy schedules that also took a few weeks. So this past Monday I finally started working on the plane again.

Here is what I borrowed. I swear I felt like a kid on Christmas when I could finally get building again. Little did I know what was about to unfold.


Full disclosure, I thought I would roll the LE in a day and pop some pull rivets and be done with it... WRONG!

This turned out to be the worst part of the whole kit thus far for me. I absolutely didn't get how to properly do this. Even after yet another builder send me an email with pictures on how he did it and spend some time on the phone with me explaining his method (THANK YOU SO MUCH) I still had a really hard time with it and spend the better part of 20 hours spread over 3 days rolling these 3 leading edges.

Let's try to start at the beginning.
This is what I started with. 2 pretty decent looking elevators. By the way I primed the outside of the control surfaces during my non building time because I was getting pretty bad filliform surface corrosion at the rivet heads. I talked to Vans about it and due to the climate here I decided the parts were going to need some protection for the time of the build.



I used 3M tape and a wooden broom handle. Size was something like 0.85in. The plans call for 3/4 -1" so I thought this would work well. First I tried to roll them all at once but that didn't work out so good so I did them in 3 sections.

Then I turned it around and started rolling. I had carved the end of the wood to better hold it with some pliers. I also had this self made tool holding the wood from rolling up and preventing the bend close to the spar.


Result wasn't very pleasing. I suppose you can hardly tell whats going on this picture. But Lets just say I had an incredible hard time with this task.


After the phone call from a local builder he suggested to use a 22mm galvanizes pipe. So desperate me went to the hardware store bought exactly that and tried again. The tape stuck better to the pipe than to the wood. Ok. But I was still getting nowhere. Also, I felt I needed different sizes in diameter for the different sections. the small most outer part was easily done at first try with the pipe. The others not so much.

So this was version 2.0


What I found in the archives is that a lot of people had good success with this method: Socket Roller

I actually didn't take any picture because I was just really pissed at the whole time... I did Video tape the process. So if I get bored enough I may throw together a little clip.

Here is one elevator.






Oh yea and 2 roles of tape...


This was a PITA! What bugs me most is that through the whole first kit there have been tricky things but all was due to the fact that I have never done it before and was unfortunately making experiences on the actual parts. But after there was always. "well next time I will get it perfect, because now I know how to do it" Weather it was just use this tool over that or try different technique. But the rolling leading edges had non of that. If I had to do all of them again tomorrow it wouldn't get easier nor would I get a better results. So that was the most frustrating part for me.

I didn't learn how to do it and that is usually the rewarding part of the process
__________________
VAF 05/2017 dues paid
RV7 - Working on empennage
Cessna Rocket 210HP - Best dang 172 Ever made!

Last edited by RV7ForMe : 07-01-2017 at 04:26 AM.
Reply With Quote
  #72  
Old 07-01-2017, 01:33 PM
RV7ForMe RV7ForMe is online now
 
Join Date: Jul 2015
Location: Europe
Posts: 274
Arrow #42

Now that I have complained enought about the leading edges I got to do some things that I did know how to do. Drilling and cutting...

I followed the plans and put the Rod end bearing into the elevators to the correct spacing and attached the elevator to the rear spar of the HS. I had a bit of a hard time at first because I had primed the powder coated brackets and the bolts didn't want to go in. Since the space it tight I decided to drill away the paint from the wholes. I guess this will be a corrosion issue place but since it will be lubed it should be no problem I suppose.

After that they slid right in. (BTW my rear spar of the HS isn't riveted in place because I still need to get it signed off)


Next thing I needed to trim the HS to match the elevators movement. I think the HS is the same as the RV-8 and therefore needs to be adjusted a bit.


Nothing hard. Still took my sweet time. Measure twice. Cut once.


I drilled the corner of the cut with a small drill and then used a dremel tool to cut the rest.



Deburr


Repeat 4 times... DONE!
__________________
VAF 05/2017 dues paid
RV7 - Working on empennage
Cessna Rocket 210HP - Best dang 172 Ever made!

Last edited by RV7ForMe : 07-01-2017 at 01:54 PM.
Reply With Quote
  #73  
Old 07-01-2017, 01:53 PM
RV7ForMe RV7ForMe is online now
 
Join Date: Jul 2015
Location: Europe
Posts: 274
Arrow #43

One little modification I have done to my tail feathers I had previously written about. I had used this flexible cable tubing in the front end of the VS going to the top because I am planning on having an antenna and / or a camera up there. The idea was stolen from others on the forum, but my design was flawed. I didn't notice this until I accidentally moved the VS abruptly and it had made a disturbing noise. The hose being flexible and the VS being tight caused contact with the skin.



Just to give you an idea what type of tube I had used.


Glad I caught this now rather than later. My new solution needed to be something that didn't move. So I bought a light weight pipe made of fiberglass. Cut to length and installed.


View from the inside
__________________
VAF 05/2017 dues paid
RV7 - Working on empennage
Cessna Rocket 210HP - Best dang 172 Ever made!

Last edited by RV7ForMe : 07-01-2017 at 01:56 PM.
Reply With Quote
  #74  
Old 07-01-2017, 07:24 PM
jcarne's Avatar
jcarne jcarne is offline
 
Join Date: Jul 2016
Location: Worland, Wyoming
Posts: 330
Default

I feel your pain on them leading edges, they were not easy to do! I found that the front of them had to have a tighter radius than the section closest to the spar. Your rolled edges look great though!
__________________
Jereme Carne
PPL
RV-7A Emp. coming along
Working on Wings
Exempt but gladly paying!
Reply With Quote
  #75  
Old 07-02-2017, 07:51 AM
RV7ForMe RV7ForMe is online now
 
Join Date: Jul 2015
Location: Europe
Posts: 274
Default

Quote:
Originally Posted by jcarne View Post
I feel your pain on them leading edges, they were not easy to do! I found that the front of them had to have a tighter radius than the section closest to the spar. Your rolled edges look great though!
Thanks. Don't let the pictures fool you. But I just saw yours. They look perfect!
__________________
VAF 05/2017 dues paid
RV7 - Working on empennage
Cessna Rocket 210HP - Best dang 172 Ever made!
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 04:47 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.