I thought that meant that the hole that I drilled should be perpendicular but (well, maybe it does) .... I was just about to drill those holes in step 2 after following all steps (really...) and decided to level the Aft fuse and check to see if the hinge brackets were plumb. They aren't.
Depending on the level I use and its mood (referring to the digital one..) I am between 1/4 and 3/8 out of plumb from the top hinge bracket to the bottom one. I chose the F-01418 longeron just forward of F-01407 as the position to level the fuselage. Fore and aft I did keep a little out of level so that the plumb line was close to the hinge bracket holes.
Anybody else notice? I cant see a way to measure perpendicular outside of a plumb bob. I accept suggestions.
Thanks in advance....
Depending on the level I use and its mood (referring to the digital one..) I am between 1/4 and 3/8 out of plumb from the top hinge bracket to the bottom one. I chose the F-01418 longeron just forward of F-01407 as the position to level the fuselage. Fore and aft I did keep a little out of level so that the plumb line was close to the hinge bracket holes.
Anybody else notice? I cant see a way to measure perpendicular outside of a plumb bob. I accept suggestions.
Thanks in advance....