Guys,
Are the steps in the plans as detailed intended to be complete as is or is there more detail early on and assumptions made on standard practice in later steps.
In the horizontal stabilizer section, final drilling is called out for the spars but not for example, page 08-09, step 1 riveting of hs1004 to hs00916.
Does this mean that no final drilling is needed for this step or that I should assume to cleco and final drill, deburr, etc prior to riveting.
I have a lot of experience spelling "assume".
Are the steps in the plans as detailed intended to be complete as is or is there more detail early on and assumptions made on standard practice in later steps.
In the horizontal stabilizer section, final drilling is called out for the spars but not for example, page 08-09, step 1 riveting of hs1004 to hs00916.
Does this mean that no final drilling is needed for this step or that I should assume to cleco and final drill, deburr, etc prior to riveting.
I have a lot of experience spelling "assume".