Wow, now this task is much faster than the RV-10. At a few minutes to lunch time break I finished the baffles. Next step was the baffle seals. I sneaked a peak at my next task after lunch and before quitting for lunch, almost all the seals were clecoed in place. I probably spent a day or more on the RV-10 to get to that point.
Thanks Van's
Thanks Van's