I know there is plenty of discussion about transponder checks but....
I'm two months away at most from being ready for scheduling a DAR visit. My question is, does the transponder need to have its function test done and signed for before I can get AW inspection? I fly from a non towered field and not anywhere close to areas that require the mode C be on. Is this something that can wait until phase one is complete or will I need it tested prior to the DAR visit?
Also, it's my understanding that since this is not IFR, I won't need a pitot/static check?
What about a bench calibration test? Is that necessary beforehand or can that wait until a discrepancy is noted in altitude reporting?
Thanks !
I'm two months away at most from being ready for scheduling a DAR visit. My question is, does the transponder need to have its function test done and signed for before I can get AW inspection? I fly from a non towered field and not anywhere close to areas that require the mode C be on. Is this something that can wait until phase one is complete or will I need it tested prior to the DAR visit?
Also, it's my understanding that since this is not IFR, I won't need a pitot/static check?
What about a bench calibration test? Is that necessary beforehand or can that wait until a discrepancy is noted in altitude reporting?
Thanks !