VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics

  #51  
Old 08-12-2017, 06:29 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 9th, 2017. Hours Worked: 1.75

I built my bending brake / jig for the trailing edge of the elevators tonight, and decided to give it a whirl on the right elevator. It came out really good, and it looks like the trailing edge is going to be straight as an arrow. I had been working on the plane earlier today, but took a short little break and started back at it. First up, I had to build my bending brake / jig using some 2◊6 boards that I picked up a couple of weeks ago from the Lowes Aviation Suppy here in town. Vanís has some directions on how to build a simple little brake, but I have modified it very slightly per some suggestions from Vans Air Force members. Instead of hinging the 2◊6 boards so they fold width wise, I hinged them so they fold on their narrow side, which should make the break much more sturdy.





ę Riveting the Elevator StiffenersRiveting the Left Elevator Stiffeners Ľ
Bending the Right Elevator Trailing Edge
By Lynn Dixon | February 9, 2017 | Total Build, Empennage, Elevators
I built my bending brake / jig for the trailing edge of the elevators tonight, and decided to give it a whirl on the right elevator. It came out really good, and it looks like the trailing edge is going to be straight as an arrow. I had been working on the plane earlier today, but took a short little break and started back at it. First up, I had to build my bending brake / jig using some 2◊6 boards that I picked up a couple of weeks ago from the Lowes Aviation Suppy here in town. Vanís has some directions on how to build a simple little brake, but I have modified it very slightly per some suggestions from Vans Air Force members. Instead of hinging the 2◊6 boards so they fold width wise, I hinged them so they fold on their narrow side, which should make the break much more sturdy.



This lets me clamp the brake to my work bench so I can use it easier, and gives a nice flat surface for the elevator to lay against during bending. It also lets me use more leverage. Bending the trailing edge took a bit more work than what I was thinking. It takes quite a bit of force to get this thing to lay down! I did my bending in short easy bends so I didnít over do it, checking as I went to make sure the elevator is bending straight. After several rounds of applying pressure, removing the elevator and checking it, I finally started to get it close to being bent.



Once I get the skin to the point that it laid naturally across the front spar, I clecoed the front spar and the end ribs in place to get a better idea of how it was turning out. I was pretty close at first, but had to put it back in the brake a few more times to get it perfect. I used my square to check that the bends were complete. What we want to see is the skin flat against a straight edge, all the way from the front spar, down to the trailing edge, where the bend sharply drops off to a perpendicular to the square. If the skin sort of ďfallsĒ slowly away from the straight edge, you havenít bent it enough. If the skin concaveís away from your straight edge, you have to much bend. Too little bend is WAY easier to fix than too much, so I did this in small steps to make sure I didnít over do it. I checked the skin from the top to the bottom at every stiffener and in between the stiffeners using my square and its looking really great:







However, I think I have a very slight twist in the elevator somehow. When I laid a straight edge (4 foot aluminum drywall ruler) across the trailing edge from top to bottom I noticed that the trailing edge bowed about 3/32″ around the middle. I thought I had a photo of that, but it was overexposed from the flash reflecting off the ruler. But, I decided to call it a night at this point. I am fairly happy with the trailing edge, and Iím going to post a question over on the forums about the very slight bow. Itís probably easily fixable seeing as how I havenít riveted the elevator yet. Heck, the 3/32″ may actually be in spec for the rudder, Iím going to do some research and find out.

Google Photos Link: https://goo.gl/photos/NrH78YdKxtHENdNV6

Hours Worked: 1.75
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #52  
Old 08-12-2017, 06:32 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 9th, 2017. Hours Worked: 2

More Stiffeners!! Tonight I think I should be done with stiffeners at least for a little while (wing kit maybe?). I worked to rivet the last remaining stiffeners on the left elevator, and then moved on to attaching the E-615PP trim support plate. First, I started off by working on dimpling and countersinking the E-615PP support plate to get it ready to rivet on the nut plates. I found my #6 dimple die and I have decided to use NAS1097 3-3.5 rivets to hold the nut plates on. I used my deburring bit and machine countersunk the E-615PP by hand. This took a little time, but it guarantees a very nice finish. I test fit each rivet in the holes to make sure they were nice and flush.



Then I dimpled the screw hole with a #6 dimple die to fit the dimple in the trim cover plate and its screw. Once I had all the holes countersunk and dimpled, I began back riveting the nut plates onto the plate. I decided to back rivet because this leaves a very nicely finished rivet and doesnít take any extra work. I am really happy with how the nut plates turned out:







With the E-615PP completed, I moved on to the last of the stiffeners! There isnít much to talk about here, since I have done this several times in the past, and the process is the same. I back rivet the stiffeners onto the skins and make sure everything is flush and straight. The only difference is that this time, we are also going to back rivet the E-615PP support plate to the skin as well. It serves as both a stiffener for the inboard end, as well as a doubler for the electric trim servo and its mounting plate. I took my time, and everything came out looking really nicely.





This was about 2 hours of work, but I decided to take a break and then start working on my bending brake for the trailing edge of the elevators, and maybe bend one up. Thats all for this session, here are all the photos from the build:

Google Photos Link: https://goo.gl/photos/JTmj5mFvK3qrvBbr8

Hours Worked: 2
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #53  
Old 08-12-2017, 06:37 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 12th, 2017. Hours Worked: 2.5

I spent about 20 minutes bending the left elevator trailing edge in the bending brake tonight. I figured since I already had my bending brake setup on my bench, I might as well go ahead and bend the left elevator as well. Since this elevator doesnít have as much trailing edge to bend (due to the trim tab), it was really easy to get bent to the right shape and only took about 20 minutes counting checking it with a straight edge. It came out great, and then went back on the shelf until I get ready for it.



I decided to do a little more work on the right elevator since it took less than a half hour to bend the left. I thought I would go ahead and get the right elevator assembled so I could match drill the skin to the skeleton and get it ready for dimpling. While I was assembling the E-713 counterbalance skin to the E-703 and E-704 ribs I realized I made my first mistake, and one so bad I would need to order some new parts 🙁 I made the mistake last month during the initial assembly which you can see by this photo. Notice the counterbalance skin, I have it flipped over in the wrong direction. This cascaded down to when I drilled the lead counterweight. So, essentially what happened is I assembled everything with that skin flipped over, and then match drilled the counterweight to it. Tonight, when I started assembling everything together, I noticed the counterweight holes were not lining up, which is when I noticed that I messed this part up. You can see from these photos how the parts were drilled:




That counterweight should be on the OTHER side of the rib and you can see the sharpie marks I made tonight to see just how bad it would be to re-drill. These holes are too close so re-drilling them is not an option. But, it looks like only the counterweight and its skin are needing to be replaced, and since the kit came with two (one for the left and another for the right) I can just use the remaining E-714 and E-713 that would have went on the left side, to keep working until the replacement parts come in. Both the left and right parts identical.

Thank goodness that I only need to replace two parts, the E-714 counterweight and the E-713 counterbalance skin for a grand total of about $40 from Vans. I am so glad I caught this now, before I wound up having to replace more parts! Oh well, I guess its good that my first mistake was something that is easy to fix and cheap to replace. Luckily it wonít hold up any progress while I wait on the new parts.

So, I pulled out the E-714 and E-713 from my stock and re-drilled the skin and counterweight MAKING SURE the orientation was correct this time :-). Drilling lead is a pretty rough task on a drill bit, so I kept it slathered up in Boelube. With that squared away, I decided Iíd go ahead and assembly it to the skeleton and then match drill the left elevator skin to the skeleton to get it ready for dimpling. This was pretty uneventful, and went quickly.





Lastly, I figured I would get the last little step done tonight which was to match drill the WD-605-R elevator horn to the inboard side of the rudder. I clecoíed it on to the inboard R-709 rib, double-checking its orientation (I bet this part is expensive to fix, compared to the counterweight ha!), and then drilled it with a #40 drill bit.







And with that, the right elevator is ready for disassembly, dimpling and then riveting. That will be in another work session, I was a bit frazzled after worrying about messing up the counterweight, so I called it a night.

Google Photos Link: https://goo.gl/photos/2i6PtVKFbjNHSrat8

Hours Worked: 2.5
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #54  
Old 08-12-2017, 06:39 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 13th, 2017. Hours Worked: 2.5

Its almost time to rivet the left elevator together, but first I have to take care of a few last tid bits. I disassembled the right elevator and deburred all of the parts, including the skin. The next step was to dimple the skin using the DRDT-2 and then dimple the skeleton parts using my squeezer, since some of these ribs have limited access. On the trailing edge of the ribs, I had to break out the pop rivet dimple dies to get in those tight spaces, which takes a little time and patience. The parts came out looking great and a test fit of a AN426 rivet seemed to agree:



Then I beveled the edges of the E-713 counter balance skin so that it would have an easy transition from the E-701 skin laying over the top of it. I started out getting it roughed out with a file, and then finished it off on the scotchbrite wheel to get a nice smooth bevel. I also rolled the edges of the skin so that it will lay nice and flush against the E-713 when it comes time to rivet. These little time sinks are things that take patience but are what creates a superb quality product in the end, so its time well spent.



Even though it doesnít seem like a lot got done tonight, I had a solid 2.5 hours of work getting these parts prepped for final riveting. Since I had to replace the E-713 counterbalance skin, I will need to do another small priming session to prime the inside of the skin, and I am going to also prime a few of the doublers for the nut plates as well. I will probably setup for the priming session tomorrow and maybe start riveting the skeleton together.

Google Photos Link: https://goo.gl/photos/D6SH5X6hfyLBFwYi8

Hours Worked: 2.5
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #55  
Old 08-12-2017, 06:41 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 14th, 2017. Hours Worked: .75

I started off tonight by priming a few little odds and ends for the right elevator. I had missed the little doublers in my first round somehow, and I needed to prime the replacement counter balance skin too. I decided to mix up a very small amount of AKZO and use my primer pistol to spray these few parts. The primer pistol is dead simple, and uses film cans as its paint cups which makes it easy cleanup.





This was the first time I have ever used this primer pistol, and its pretty convenient, However, it sprays super heavy, so I had to back way away from the parts. I did get a little bit of bubbling on one of the doublers from the heavy spray, but Iím not worried about it since its a part that will not be visible. I followed my normal procedure of scuffing with scotchbrite, cleaning with acetone and priming. I am pretty happy with the way these parts came out, regardless of the heavy spray from the primer pistol. It done a decent enough job, and the next time, I will just keep the tip far away from the parts to get a thinner coat. I do like how easy the cleanup is: Just toss the little film can and run a small amount of acetone down the tiny copper tube.



That was pretty much it for this small session. After cleaning up, I took a short break and will come back down to finish up the skeleton in another session tonight. Spent about 45 minutes on this, counting the 30 minutes for the AKZO to catalyze after mixing it up. I used that time to prep and clean the parts. Heres all the photos:

Google Photos Album link:

Hours Worked: .75
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #56  
Old 08-12-2017, 06:44 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 14th, 2017. Hours Worked: 3

After taking short break from the priming session, I dug back into riveting together the right elevator skeleton. This will give the primer on those doublers some time to dry. AKZO dries super quick, so by the time I get ready for them they should be ready for me 🙂 Per the plans, Vans has us start out by riveting together the E-703 and E-704 ribs which creates the counterbalance assembly This goes easy enough with a squeezer and some AN470AD4-4 rivets.



Next up the plans has us rivet the E-709 end rib to the E-702 spar. I had to take caution here, because we use AN426AD3-4 rivets, which need to be dimpled and sit flush on the front side of the spar so that the WD-605-1-R elevator horn will sit flush against the spar. I was able to set these rivets with the flush set in my squeezer and they ended up nice and flush against the spar.



Then the plans has us rivet on the E-703/704 assembly to the E-702 spar. This is where things got frustrating. I was able to set the two rivets for the E-703 end rib with the squeezer. However, the two rivets for the E-704 were in a much tighter spot and I couldnít get to then with the squeezer. So, I drug out the rivet gun and bucking bar, but the straight 1/8 rivet set would not line up with the shop head of the rivet because of the gun body, so I had to use the offset 1/8 rivet set. The first rivet I was able to set pretty well with the gun and bucking bar. The second one? Yeah, not so much. I had to drill it out and try again. Luckily, the second time went better than the first and I got the rivet set.





I then decided to skip back up to the doublers and platenuts on the E-702 spar. These were fairly easy to do, I just double checked that I had the right length rivets in the right holes, as we use three different lengths in these sections. I also double checked I had the orientation of the platenuts correct as well, and then used the squeezer to set al these rivets. I love the way it came out!





Finally, I decided to rivet on the WD-605-1-R elevator horn to finish off the skeleton. Again, double checking the orientation, because it is possible to put this part on upside down if youíre not careful. Then, I riveted in using AN470AD4-4 rivets and my squeezer.







This finishes up the right elevator skeleton, and in the next session, I think I will rivet the skin to the elevator, but I am still debating on saving that portion until I get ready to pro-seal the rudder trailing edge. This way I can use the same ProSeal to bond the trailing edges of the stiffeners of the elevators. Weíll see how it goes.

Google Photos Album link: https://goo.gl/photos/Mu4Tk4GGtpf46Rmq9

Hours Worked: 3
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #57  
Old 08-12-2017, 06:49 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 17th, 2017. Hours Worked: 2.25

Its time to rivet up a control surface! The right elevator is ready to be closed up and riveted. I have decided that I am going to rivet the bottom side of the skins, and leave the top side clecod down for now. This way, I can hold off on ProSealing the trailing edge stiffeners until I have the rudder, and both elevators ready for ProSeal. This will save me from having to waste so much of this stuff, and I can get all the ProSeal work done in one session.

So, tonight I begin with riveting on the E-713 counterbalance skin to the E-701 skin. We do this because two of the rivets would be enclosed inside the skin once we insert the skeleton, and not be accessible. So, we rivet those two rivets with the skeleton out of the skin at first. I used my squeezer to set these rivets.

Once those two rivets are set, its time to shape the counterweight. I filed down the sharp corners to match the contours of the E-713 skin, and also filed down around the edges so that it would fit in the skin easier. The we loose fit the E-714 counterweight into the skin, and then the skeleton assembly gets inserted into the skin. Its a tight fit trying to wiggle it all together, especially around the counterweight. Eventually I got the skeleton all situated into the skin and then I clecoed every hole to make sure it didnít twist or shift.






Now its time to rivet! I thought itíd be best to start at the counterweight and work my way up the E-713 skin, and all the way down the tip of the end rib. Thereís a few different lengths of AN423AD3 rivets being used here due to the different overlapping skins, so I made sure to use the right one in each hole. I had previously lapped the edge of the skins so that they would sit nice and flush after riveting, so I didnít have to do that here. Once I had the end rib riveted, I worked my way down the spar and finally to the E-702 end rib. I was able to use my squeezer on all these, so they came out perfect.







Having the bottom skin riveted on completely, I left the top skin just clecod for now. I will come back to it later on, ProSeal the stiffeners and close it up. The last few steps on this elevator is to finish attaching the counterweight and torquing it. I dug through my parts, got the bolts, washer and nut that the plans called for and used them on the counterweight. Then I used my beam torque wrench to measure the drag on the nylon lock nut (which was 5 inch/lbs), and added that to the the 20-25 inch/lbs that the plans calls for as the torque spec on these type of bolts. In total, I torqued them down to right at 30 inch/lbs total and then use some CrossCheck (Torque seal) to mark the nuts and screw heads as being torqued. This CrossCheck also makes it easy to inspect the bolts to make sure they have not vibrated loose. The paint will crack if the bolt or nut has turned.





Thats all for tonight! A little over 2 hours total, and the right elevator is 95% completed, and will go back on the shelf until I am ready to ProSeal everything. Hereís all the photos I took tonight:

Google Photos Link: https://goo.gl/photos/GRC1mBikUq2TWKsEA

Hours Worked: 2.25
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #58  
Old 08-12-2017, 07:00 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 18th, 2017. Hours Worked: 4

I managed to get a TON of work done tonight, and worked a straight 4 hours on the section of plans titled ďPreparing the Left ElevatorĒ. In a nut shell, I completely build entire left elevator, and have it disassembled so all the parts can be deburred, and the edges finished. After that, I will shoot them in AKZO primer and then they will be ready to be dimpled and riveted. This is going to be a long post, since I got so much work done tonight, so hang on!

We start off the right elevator in pretty much the same fashion as we did the left, since they are almost identical (except for the trim tab). It starts by rounded off the top and bottom edges of the E-00001A doubler so that it will nest correctly in the E-702 spar channel.

After that, we cleco on the E-610PP and E-611PP doublers on the back side of the spar, as well as the E-00001A and E-00001B doublers on the front side. These doublers are a part of SB-14-02-15 which was included in my tail kit. Once all the doublers are clecod on, we match drill them to the E-702 spar.



After that, we straighten the flanges and flute both the E-703 and E-704 ribs, and then cleco E-703 end rib and E-704 counterbalance rib together, and then match drill them. This takes a little time as I had to flute them in several places to get them straight and flush with each other. In the end, they cooperated and fit together snugly. Then Vans has us fit them to E-702 spar and match drill the holes to the spar. Once they are drilled, we remove the rib assembly from the spar to fit the lead counterweight.



This is where I messed up on the previous elevator and had to order a new E-713 counterbalance skin, and another E-714 counterweight. That cost about $40, and they showed up at my house today! Talk about perfect timing! It takes a little bit of filing on the lead counter weight to get it to match the curvature of the E-713 skin and to fit snuggly. I also double checked to make sure I had the orientation correct so I donít repeat my mistake from last time 🙂 Once they counterweight has been shaved and filed down to fit good, we assemble the lead counterweight, the E-713 counterweight skin, and the E-703/E-704 rib assemblies to drill the counterweight.

When drilling lead, I decided to use a #30 drill bit in the pre-punched holes as a pilot, and follow it with the proper size #12 bit, using LOTS of Boelube to keep the bits lubricated. Clamping the assembly to the corner of my work table made this much easier to do as well. I used my electric drill instead of the pneumatic because I need slow speed with lots of torque to drill the lead. This worked out great, and the holes were straight and perfect.

Now that the counterweight is drilled, we remove it from the assembly and set it aside for now, this makes assembling the skeleton much easier to deal with. We then re-cleco the E-703/E-704/E-713 assembly to the E-702 spar. Then we cleco on the E-705 root rib and match drill it using a #40 bit to the E-702 spar.

Now that the counterweight is drilled, we remove it from the assembly and set it aside for now, this makes assembling the skeleton much easier to deal with. We then re-cleco the E-703/E-704/E-713 assembly to the E-702 spar. Then we cleco on the E-705 root rib and match drill it using a #40 bit to the E-702 spar.





Its skining time now! I clecod on the E-701-L skin to the newly built skeleton, making sure to keep the E-701 skin on TOP of the E-713 counterbalance skin. Next, Vans has us remove the clecos holding on the E-705 root rib to the E-702 spar, so that we can fit the WD-605-1-L elevator horn and match drill it to the E-705 and E-702. I match drilled these to a #30 size drill.


Once we have the elevator horn drilled, I inserted the little E-606PP spar into the skin, and clecoed it to the E-705 root rib and E-701 skin. I also had to match drill the E-606PP to the E-705. At this point, I have my entire right elevator assembled and ready to be match drilled. I matched drilled the E-701-R skin to its skeleton using a #40 bit per the plans.



You guessed itÖits time to disassemble the elevator so that I can deburr, dress the edges, prime, and dimple them. At this point, I noticed that my cleco bucket was running pretty low:


After getting the elevator disassembled, I decided to continue on and finish up the last few little easy steps in this section of the plans. I had to machine countersink the E-714 lead counterweight to match the dimple and screw, so I did this with my deburring tool, which worked nice. Then I used a #10 dimple die to dimple the E-713 counterweight skin to match. I checked all these with the screw to make sure it looked great.



Now, this is where it gets a little tricky. The little E-606PP spar needs to be machine counter sunk on the top to mate with the dimples in the skin. We machine countersink it because we donít want the protruding dimple on the underside of the spar because the trim tab hinge gets riveted to it on the bottom. However, we are able to dimple the BOTTOM of the E-606PP spar so it will mate with the skin dimple, and because there isnít anything that will interfere with the dimple protrusion on the spar. This drawing makes it easier to see:


So, I deburred all the holes, and chucked up my countersink cage in my drill and countersunk every hole along the TOP of the E-606PP, checking each one with a rivet to make sure it was flush. Then I used my squeezer and a 3/32 dimple die to dimple the BOTTOM of the E-606PP, except for the last two holes. They were too tight to fit the squeezer, and the spar was too thick for the pop rivet dimple die, so I just machine countersunk the last two holes on the bottom. Simple and easy solution!



Then I machine countersunk the two holes that attach the E-606PP to the E-705 root rib, orienting the countersink so that the flush rivet will go in with the flush head on the aft face of the E-606PP. This will eliminate any chance of interference during the trim tab travel, and make it look nice and neat in this area. The plans said we could do the countersink on either side of the hole, so I chose to do it this way. Then, I dimpled the holes for the E-705 to R-702. Vans calls for this to be machine countersunk, due to the sharp bend on the E-705 root rib, making it hard to dimple, but I was able to get my dimple dies in there and squeeze them without any problems. We have to use flush rivets here because the WD-605-1-L elevator horn fits over this intersection. Lastly, the only thing left in this section is to bevel the edges of the E-713 counterweight skin so that the E-701 will overlap it very smoothly where they meet. I used my file to work the edges into a nice bevel where the two skins meet. This worked out very nicely on the right elevator, so I used the same technique here.


With that, the right elevator has been assembled and ready for all the parts to be dressed. In the next few sessions I will work on deburring all the holes (so many holes deburred at this point!), dressing all the edges with the scotchbrite wheel and then priming them. Follow that with dimpling and final assembly! Here is the photo album from tonights work:

Google Photos Link: https://goo.gl/photos/rpvXUguFpbjwQyqd7

Hours Worked: 4
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #59  
Old 08-17-2017, 09:54 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 22nd, 2017. Hours Worked: 2.25

I got to do some pretty neat assembly work tonight, working with actual aircraft components, instead of just aluminum! I worked on assembling the mounting brackets for the Ray Allan Electric Trim servo. I also deburred all of the metal parts for the left elevator skeleton. The work session started out by unboxing the electric trim servo. Vanís ships this assembly as an option for the RV-7, and they include all the mounting brackets, screws, nutplates, rivets and hardware thats needed to fully install it. Another testament to how well Vanís build their kits!



I started out by studying the plans to note the proper orientation of all the parts. There are quite a few custom bent brackets and they need to be lined up just right in order to drill the holes correctly. The plans gives us some measurements to place the EET-602B-L mounting bracket. I decided to mount the E-616PP cover plate to the skin so I could draw an outline of where the ribs and skin lay on the cover plate. This will keep me from mounting the brackets to close and causing interference, and I also made sure to notate the orientation of the plate in reference to the aircraft as well. Once I had that all marked up, I used a straight edge to mark lines on where the plans tells us the forward edge and inboard edges of the EET-602B-L bracket. Then I placed the servo bracket on the plate, using my lines as a guide and clamped it on with cleco side clamps. Once I verified that the bracket was where it needed to be, I drilled the holes and attached it with normal clecos. Now that the hard one was done, I just stuck the servo in that bracket, and then placed the right side bracket and used the servo attaching bolts to hold it while I drew and measured its placement on the E-616PP plate.





When I was happy it was in the right spot, I removed the trim servo and match drilled the holes into the E-616PP plate using the bracket as my guide. Stuck in some clecos, and made sure it all fit perfectly.





Happy with how the trim system went in, I decided to drill a 3/8 hole in the elevator spar, just above where the stock hole is. I will use this 3/8 hole and a snap bushing to run the wiring for the servo, and the stock hole for the servo jack shaft. This way, I donít have any wearing or chaffing of the wiring, and there is less chance of the jack shaft binding on the wires. This is a suggested procedure per Vanís. You can see the smaller 3/8 hole just above the larger stock hole in the photo below:


Once that was all done, I decided to go ahead and deburr all the holes in my left elevator skeleton. I spent about an hour or so doing this, and got all the parts deburred and ready for dressing the edges. I will do that tomorrow night, and then these last few remaining parts will be ready for priming.



That was a good stopping point for the night, so I cleaned up the shop, swept up all the metal shavings and called it a night. Here is the full album of all the photos: https://goo.gl/photos/P4WYQJMj8xHAjkyD6

Hours Worked: 2.25
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
  #60  
Old 08-17-2017, 09:59 PM
CubedRoot's Avatar
CubedRoot CubedRoot is offline
 
Join Date: Sep 2013
Location: Ooltewah, TN.
Posts: 435
Default February 23rd, 2017. Hours Worked: 4

I started this session by first dressing the edges of the left elevator skeleton parts, but that only took about 30 minutes, so I decided to find something else to work on. Since those parts are waiting on priming, the only thing I have left to start on is the trim tab. I read the plans and decided to give it a go and try to get the end tabs bent, and some work done of the trim tab itself. I managed to almost finish the trim tab assembly tonight 🙂

After dressing up the edges of those left elevator parts, I laid them up on the shelf and dug out the trim tab parts. First we have to start off by bending the trailing edge of the skin for the trim tab, and this is done exactly like the elevators. So I set up my bending brake and put a very smooth and gradual bend on the trailing edge, and made sure it was straight with the spar in place.





Granted, I took my time on this, I got it done in about 20 minutes or so. I have been reading up on bending these tabs for a while now, and watched the Orndorff videos, so I was pretty prepared to begin. I started out by making some bending blocks that fit into the end of the trim tab. I used the tab itself to draw an outline on a piece of 2◊4 and then cut the shape out on my bandsaw. I made two sets because the bends on each end are at slightly different angles.



With the bending blocks made up, its time to get to bending the trim tab! I start out by inserting the blocks and clamping everything down to my work table nice and tight so it doesnít move during bending.



We start out by bending the bottom tab first, and overlapping it with the top tab, so that the top tab folds over the bottom, helping to keep water and debris from getting into the trim tab. I used a block of wood in my hand to get the bend started and once I had it at about a 45 degree angle, I use a small hammer against my wood block to help shape the metal. This way, I am using the soft face of my wood block against my tab and the bending block instead of the hard metal face of the hammer. This keeps from dinging, denting and scuffing the aluminum. I took lots of time and did this very slowly, using small light taps with the hammer against my block to bend the metal. Once I had the bottom tab bent up to a 90 degree bend, I did the exact same to the top tab, bending it to overlap the bottom. I am really happy with the results.



Now that we have the inboard side of the trim tab bent, it time to move to the outboard. These tabs are MUCH smaller than the inboard side, so I had to take extra caution on these little suckers. They would be easy to crack if you work the metal to much. Eventually, I got them folded up, overlapping the bottom tab with the top just like on the other side. I stuck the spar into the trim tab and clecoed it in a few spots to check my work, and I am happy with how it turned out!





After having a good victory on the tab bending, I still felt good enough to continue on working. The plans have us mount the E-717 and E-718 trim tab horns to the bottom of the trim tab. E-717 has 3 of the 4 holes pre-drilled, so its easy to line up. Then I just clamped E-718 to E-717 with some side clamps, and then use one of the clevis pins and hinges from my electric trim kit to make sure the holes were lined up properly in the trim tab horns. Once everything was lined up, I back drilled both of the trim tab horns to the trim tab.



So, next up was to fully cleco on the spar, and then attach the hinge bracket so it can be back drilled. I studied the plans and made a few alignment marks on my E-721 trim tab hinge. Vans gives the measurements to the center of the hole in the skin/spar so its easy to mark the hinge with a sharpie, and then line up the cross hairs with the center of the hole. I also marked the entire centerline of the hinge to the measurements Vans gives with a sharpie so I could align every single hole. Once I had them all aligned, I used some cleco side clamps to hold it all together. Once I had the hinge clamped on firmly, I started back drilling using the holes in the E-619-PP trim tab skin as my guides.



Once I had the hinge back drilled, I flipped the trim tab over and match drilled all the holes on the bottom to the spar. Now, the plans has us disassemble the trim tab, so that we can trim off any excess from the trim tab horns, as well as the excess from the inboard side of he E-721 hinge. I went ahead and trimmed off the very little bit of excess on the E-718 and E-717 trim tab horns, and smoothed the edges with a scotchbrite pad, and then did the same to the little bit of excess on the E-721 hinge. I figured this was a good place to stop, so I called it a night. I still need to deburr the holes, dress the edges of the trim tab parts and then dimple it all. I am contemplating if I should prime the trim tab or not, not sure yet. Hereís all the photos I took tonight: https://goo.gl/photos/nFHQysMhoQBFDwdJA

Hours Worked: 4
__________________
Lynn Dixon
RV-7 Slider -
Tail kit Completed - March 2017
Wing Kit Started - June 2017
My Build Log: http://www.theskunkwerx.com

VAF Donation paid for 2017
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 07:56 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.