VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Model Specific > RV-10
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
  #11  
Old 08-07-2017, 07:53 PM
AviatorJ AviatorJ is offline
 
Join Date: Feb 2015
Location: Oklahoma City
Posts: 509
Default

Quote:
Originally Posted by Bill Boyd View Post
But if you're cutting for the McMaster seals, you will ultimately grind/sand for a 1/4" gap from the door, and that takes the curved portion of the door sill pretty much flat, parallel to the inside surface of the door. This results in a sharp edge, and necessitates building up the door sill edge to a consistent 1/4" thickness. Best done IMO as others have done, with pieces of McMaster seal used as a removable/reusable mold to hold flox in place on the door sill while it cures. Gives a perfect fit. Do other stuff while it cures. The leftover piece from a 25 foot order will do one doorway in about 5 cure sessions/nights. But be careful with it. Tears if handled roughly.
I had issues with that approach. Ended up having to manually build everything up later and then sand it all down. Ended up turning out great but my initial cutting to the scribe line probably made the entire thing much harder.
__________________
Justin
RV-10 Quickbuild 'Finishing Kit'
http://operationrv10.blogspot.com/
Donated for 2017
Reply With Quote
  #12  
Old 08-07-2017, 08:04 PM
Ivan Kristensen's Avatar
Ivan Kristensen Ivan Kristensen is online now
 
Join Date: Mar 2008
Location: Guelph Ontario
Posts: 157
Default McMaster Carr door seal

Quote:
Originally Posted by jeffwhip View Post
How can I find Ivan K's measurements? I'm getting ready to fit my cabin cover this week!
Here is a link to the section of my build for the doors which includes a number of pictures showing measurements of where to cut. The very first slide is actually a little video, which I had forgotten all about, it gives some specific measurements. Some areas get a bit thin but that is required in order to be able to close the door using the McMaster Carr seal. I built up the inside of those areas so that the seal grip was retained.

https://ivankristensen.smugmug.com/B...t/Cabin-doors/

Ivan
__________________
RV-10 Quick Build
SN # 40838 (C-GMDV)
First flight June 28, 2010. Now 1000 hours of flight time.
Home field is Waterloo Regional Airport (CYKF) Ontario Canada,

2017 VAF dues paid.

Link to my build site:
https://ivankristensen.smugmug.com/B...ENTAL-aircraft

Last edited by Ivan Kristensen : 08-07-2017 at 08:23 PM.
Reply With Quote
  #13  
Old 08-08-2017, 05:36 AM
Bill Boyd Bill Boyd is offline
 
Join Date: Sep 2006
Location: Landing field "12VA"
Posts: 898
Default

Quote:
Originally Posted by AviatorJ View Post
I had issues with that approach. Ended up having to manually build everything up later and then sand it all down. Ended up turning out great but my initial cutting to the scribe line probably made the entire thing much harder.
What I describe is one approach to "building it up later." In my case, sanding the cabin top to a distance of 1/4" away from the inside of the doors was beyond any scribe lines I could make out.

He will have to sand some doorway material away just to get clearance for the door pieces to seat flush for initial assembly (drilling and clecoing to the outside of the cabin while the door bond cures). From there it's very straightforward to scribe the 1/4" gap line from the inner door face, and check progress as he goes with a go/no-go feeler gauge.

In my case, much of the doorway was left with a knife-edge after this final trim. What was still full thickness was checked with a 1/4" gap gauge and if necessary ground down to 1/4" thickness for the edge seal to grip to. The rest was built up with flox, cast-in-place with seal material as the female mold. I'm very happy with the results so far.
__________________
Bill Boyd

Hop-Along Aerodrome (12VA)
RV-6A - N30YD - flying since '98
RV-10 - N130YD reserved - under construction

donating monthly to the VAF - thanks, Doug
Reply With Quote
  #14  
Old 08-08-2017, 08:41 AM
Lynnb's Avatar
Lynnb Lynnb is offline
 
Join Date: Jan 2014
Location: Cedar Hill, TX
Posts: 176
Default

Thanks for all the reply's. Lynn
__________________
RV-10 in Process
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 06:50 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.