What's new
Van's Air Force

Don't miss anything! Register now for full access to the definitive RV support community.

Wing spar J- Channel

Jskyking

Well Known Member
Finished up the left wing spar this weekend and decided to finish the right spar today.

Just realized that I match-drilled the upper j channel 8? and 6 ? sections on the flanges in reverse order. Ie. The short j- Chan should have been match drilled on inboard side and the long J- Chan on the outboard. I caught my mistake 4 holes in on the bottom flange, which was reversed as well.

I tried to match up the mis-drilled j- Chan pieces using multiple combinations, No joy. The j Chan is used later in construction, so I think it?s imperative to have them match drilled per the instructions, so unless there is another fix, I plan on ordering two new 8? sections of j-Chan and making a short section out of the jacked up 8? section.

Any better ideas would be appreciated.
Thanks
Jt

https://www.dropbox.com/s/epvtiijbzna1i7e/File Aug 05, 7 26 14 PM.jpeg?dl=0

Note: pen and ink notes aren?t applicable to the thread.
 
Back
Top