wirejock
Well Known Member
Question for 7 builders who did the removable baggage floor mod. F747 R&L
The baggage floor normally would carry nut plates with F706A for the bottom of F751 Lower Baggage Bulkhead to screw in place. The aft flange of the baggage floors are normally riveted to the F706A bulkhead and nutplates installed through both layers.
Question
Did you use the same screw holes for both baggage floors and lower baggage bulkhead?
OR
Did you install countersink nut plates specifically for the baggage floors using some or all of the #3 rivet holes? The other nutplates would still be used to hold the lower baggage bulkhead. Seems like a stronger solution.
The baggage floor normally would carry nut plates with F706A for the bottom of F751 Lower Baggage Bulkhead to screw in place. The aft flange of the baggage floors are normally riveted to the F706A bulkhead and nutplates installed through both layers.
Question
Did you use the same screw holes for both baggage floors and lower baggage bulkhead?
OR
Did you install countersink nut plates specifically for the baggage floors using some or all of the #3 rivet holes? The other nutplates would still be used to hold the lower baggage bulkhead. Seems like a stronger solution.