#ChiefPilot
RV-6A #20xxx
- Fuselage have been completed.
- Sliding canopy.
- Tail completed (original), some fiberglass work needs to be done.
- Wings completed.
- Engine and Propeller installed.
- Original nose gear.
- Instrument panel under "early" construction.
#.....
#ChiefPilot
RV-6A #20xxx
- Fuselage have been completed.
- Sliding canopy.
- Tail completed (original), some fiberglass work needs to be done.
- Wings completed.
- Engine and Propeller installed.
- Original nose gear.
- Instrument panel under "early" construction.
#ChiefPilot
- Thanks for your advice. I check from Van's nose gear staff. If it is same as used on 7A and 8A then I am good for couple of years before next models are dropped from the production.
I'm still more mad about the RV6 not being on the "aircraft" tab of the Vans site then I am about the production slow-down.