VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics

Prev Previous Post   Next Post Next
  #15  
Old 04-16-2018, 01:34 PM
titanhank's Avatar
titanhank titanhank is offline
 
Join Date: Aug 2007
Location: Friendswood, Tx
Posts: 290
Default

I did it all myself with a band saw, dremel and a file. The panel part itself took about 30 hrs. The entire project, repanel, rewire whole plane, install autopilot, convert to electric flaps and trims, install pmags, rebuild both wheel pants, rebuild both brake calipers, and program everything took 2 months and about 150 hrs. It was definitely worth it. I would never go back to manual flaps and trims.
__________________
Rv-6
0-320/190+hp
10-1 pistons
Lycon port/polish
Dual pmags
Whirlwind 200rv prop
IFR Glass panel
Trutrak Vizion 385 Autopilot
Flightline Interior
Almost rv14 seat mod/cable locking
Electric seat back adjuster
Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 09:07 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.