mikehoover
Well Known Member
Getting beat up lately with the lack of really good instruction from Vans on how to install the emp fairing and the F-994A lower emp fairing strips. Yesterday, I positioned the right side 994A and drilled it to the fuse skin/ longeron. When I removed it I noticed that the #40 holes I just drilled all were 1/8" forward of corresponding fuse skin/longeron rivets already in place. Since the drilling is done, that is where the right side fairing strip will be, but should I have lined up the pre-punch screw holes in the fairing strip with those rivets in the fuse skin/longeron. I still have not installed the left side strip, so I can get it "right" (even though both of them not being exactly the same might make the plane fly sideways
Comment greatly appreciated!
Comment greatly appreciated!