VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics

  #1  
Old 02-15-2019, 06:15 PM
richpezz richpezz is offline
 
Join Date: Aug 2016
Location: Annapolis
Posts: 6
Default RV12is - Propeller Spinner Installation

Before drilling my nose spinner for a RV12is, I want to ensure I understand the process / procedures.

I am unclear if you begin by tapping / creating threads in the forward bracket S-1203-1. Is this used for temporary screws to hold the spinner in place?

OR

Do you match drill #30 and cleco?

Section 5-18 appears to provide conflicting information.
__________________
Rich
Reply With Quote
  #2  
Old 02-25-2019, 08:28 PM
psalys psalys is offline
 
Join Date: May 2017
Location: Eugene
Posts: 22
Default

Hi Rich,

According to Step 1 on Page 47iS/U-06 you match drill #30 and cleco.
What makes this section tricky is you have to do the Magnet technique for drilling opaque fiberglass parts in Section 5.18. Read it carefully. My first time (with the wheel pants) I missed the step where you put magnets on both sides to align their polarity before you tape the magnets on the backside of S-1203-1 in place and remove the front magnets. Do this before you center the spinner with ruler and step ladder on page 5. Then once it's perfect, put your outer magnets over the nylon washers, tape in place, remove the outer magnets, and mark the inside of the washers. Then do step 1 on page 6 - match drill #30 and cleco.

The page 6 instructions are a holdover from when they supplied translucent fiberglass. Since Van's now supplies opaque fiberglass which require the magnet technique, it would be nice if Vans updated the instructions to incorporate the magnet steps into the steps on page 6

After all your holes are drilled, you will final drill the holes in S-1201 through S-1202 and S-1203, remove S1201 and rivet the nutplates onto S-1202 and S1203.

Also, there is a typo in Step 3: the second sentence should read "match drill #30 the screw holes from the S-1201 into the S-1202 ....." rather than the opposite. Good luck

Patrick
__________________
Waiting on Avionics Kit (since Dec 6th!!!)
Powerplant complete
Finishing complete
Fuselage complete
Wings complete
Emp and Tail Cone complete
Dues paid

Last edited by psalys : 02-25-2019 at 08:34 PM.
Reply With Quote
  #3  
Old 03-01-2019, 05:12 PM
richpezz richpezz is offline
 
Join Date: Aug 2016
Location: Annapolis
Posts: 6
Default

Patrick,

Thanks as your reply was very helpful.

Rich
__________________
Rich
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 01:16 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.