I am planning on purchasing a CPI-2 kit for my RV-8 soon. It has an IO-360 with slick mags, about 400 hours TT. I plan on a dual board with two coil packs. I am going to pull the panel apart for some lighting upgrades in a month or so and I want to prepare for the CPI-2 install at the same time. Looking at the install instructions I will need 4 power sources with circuit breakers and also switches for these sources. I was thinking about using 4 SPST circuit break switches (https://www.aircraftspruce.com/catalog/elpages/pbcircuitbrkr2.php?clickkey=4681) two at 15 amp for the red wires and two at 5 amp for the purple wires. I am running out of panel space and trying to minimize what goes in the panel. Would this set me up for install as far as power goes (no more circuit breakers or switches required).