sahrens
Well Known Member
For those of you that have installed Skybolt fasteners along the firewall I have a question. The instructions tell you to drill the through the cowling in alignment with the installed skybolt flanges to 15/32". I am shortened the instructions but if you have done it you know what I am talking about.
To my question. You can cleco the cowling in place but as you drilll more and more openings for the Skybolts fasteners the clecos need to be removed. So....did you stop and install retainers and Skybolt fasteners periodically, then resume making drilling openings.
I am concerned about keeping the cowling from moving as I work from the top down both sides. What am I missing from the instructions or the process?
Thanks for you assistance.
To my question. You can cleco the cowling in place but as you drilll more and more openings for the Skybolts fasteners the clecos need to be removed. So....did you stop and install retainers and Skybolt fasteners periodically, then resume making drilling openings.
I am concerned about keeping the cowling from moving as I work from the top down both sides. What am I missing from the instructions or the process?
Thanks for you assistance.