On page 41-9, the farthest aft hole on each side of the forward fuse top skin is labeled NOT RIVETED IN THIS SECTION. For the life of me, I can't find where they ARE riveted. The same is true for the holes that were left unriveted in Section 29 (shudder) that were later used for fitting the doors (page 45-03). Where/when do they get riveted?

Thanks for curing my madness.

Jeff
__________________
Jeff Rich
RV-10 Kind of all over the place in the plans. Need to get out to the airport.
N313KC reserved
WE HAVE A HANGAR NOW!!! (KJVY)
Reply With Quote
  #2  
Old 10-27-2018, 03:36 PM
rocketman1988 rocketman1988 is offline
 
Join Date: Jun 2010
Location: Sunman, IN
Posts: 1,145
Default Good Question

I was never able to find where they were supposed to be riveted...so I did it after the cabin top was on...
__________________
Bob
Aerospace Engineer '88

RV-10
Structure - 90% Done
Cabin Top - Aaarrghhh...
Doors - Done
On Gear
290 HP Barrett Hung
ShowPlanes Cowl with Skybolts Fitted - Beautiful
Wiring...

Dues Paid 2018,...Thanks DR+
Reply With Quote
  #3  
Old 10-27-2018, 03:49 PM
lr172 lr172 is offline
 
Join Date: Oct 2013
Location: Schaumburg, IL
Posts: 3,280
Default

Quote:
Originally Posted by Freightdawg View Post
On page 41-9, the farthest aft hole on each side of the forward fuse top skin is labeled NOT RIVETED IN THIS SECTION. For the life of me, I can't find where they ARE riveted. The same is true for the holes that were left unriveted in Section 29 (shudder) that were later used for fitting the doors (page 45-03). Where/when do they get riveted?

Thanks for curing my madness.

Jeff
That is one of the holes left for a door fastening cleco. They probably assume you'll figure out to put rivets in them after you are done with the doors.

Larry
__________________
N64LR
RV-6A / IO-320, Flying as of 8/2015
RV-10 in progress
Reply With Quote
  #4  
Old 10-30-2018, 05:27 PM
Freightdawg's Avatar
Freightdawg Freightdawg is offline
 
Join Date: Apr 2013
Location: New Albany, IN
Posts: 154
Default

Bob, thanks for the sanity check.

Quote:
Originally Posted by lr172 View Post
They probably assume you'll figure out to put rivets in them after you are done with the doors.
Larry, I think they assume too much. We were about to start the fairing at the base of the windscreen and realized it was going to cover an open hole.
__________________
Jeff Rich
RV-10 Kind of all over the place in the plans. Need to get out to the airport.
N313KC reserved
WE HAVE A HANGAR NOW!!! (KJVY)
Reply With Quote
  #5  
Old 10-30-2018, 06:18 PM
lr172 lr172 is offline
 
Join Date: Oct 2013
Location: Schaumburg, IL
Posts: 3,280
Default

Quote:
Originally Posted by Freightdawg View Post
Bob, thanks for the sanity check.



Larry, I think they assume too much. We were about to start the fairing at the base of the windscreen and realized it was going to cover an open hole.
I was the opposite. It was a QB fuse and couldn’t understand why they were left out, so i put them in. Got my finishing kit and rwlized the error anc had to drill tgem out

Larry
__________________
N64LR
RV-6A / IO-320, Flying as of 8/2015
RV-10 in progress
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 06:49 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.