VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Main > My RV Build Project
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
  #21  
Old 07-10-2013, 08:19 AM
David-aviator David-aviator is offline
 
Join Date: Feb 2005
Location: Chesterfield, Missouri
Posts: 4,514
Default

Quote:
Originally Posted by wjb View Post
There are hundreds of reasons why I build .. but, this is another:

Renting my favorite spam can .. a Warrior, that it turns out that it's the one I did my check ride in ... is a rental. On each of my last four flights, I had to squawk something .. nav lights out, landing light inop, landing light inop; breaker blows. The latest, the wire to the top plug on cyl #2 was loose .. very loose.... did not fly; don't know how well other 7 wires are torqued (and the plug wires looked a bit too long in the tooth)

At least, when I fly my bird, she will meet my standards when I launch. Everything as I think it should be, or I'll fix it before I fly.

One of the best privlidges we have as a builder is that we get to maintain our planes to our standards, so that when we fly, the plane is configured the way we want, running the way we want, and flying the way we want.

<end soapbox>
I like your attitude, Bill.

The flying qualities of an RV will not disappoint you in this effort.
__________________
RV-12 Build Helper
RV-7A...Sold #70374
The RV-8...Sold #83261
I'm in, dues paid 2019 This place is worth it!
Reply With Quote
  #22  
Old 07-25-2013, 11:01 PM
wjb's Avatar
wjb wjb is offline
 
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 924
Default Goodie goodie goodie goodie!

ABF showed up today with a Christmas present in July.

If you can't guess what's in these boxes, you gotta go back to EAA for a refresher course!

The wings have entered the building!



Thanks in advance for all the bone-headed questions I'll ask over the next year or so...

(BTW .. ABF was great, and I found the $220 charge to ship the stuff down from Van's to the SF areas to be totally reasonable ... I did the full residential lift gate service.)
__________________
Bill Bencze
N430WB RV-7 #74152, tip-up. Final assembly.

Log at: http://rv7.wbencze.com
Defeating gravity one rivet at a time
VAF 2019 donation happily made
Reply With Quote
  #23  
Old 07-27-2013, 05:28 AM
OLDSAM OLDSAM is offline
 
Join Date: Feb 2008
Location: Tucker GA
Posts: 190
Default

Bill,
You will find that those long, long, 1 x 8's make perfect shelves on which to store the long, long longerons until you need them for the fuselage. Plus a lot of other stuff you need to have at hand in the shop.
__________________
OldSam
RV7A, Empennage, Wings & Tanks complete
Fuse under way
Reply With Quote
  #24  
Old 08-24-2013, 08:31 PM
wjb's Avatar
wjb wjb is offline
 
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 924
Default Look, Mom, twins!

OK Kids, we have twins!



Riveted the main box of the wing today and tried out the new wing stand.

Progress has been made!
__________________
Bill Bencze
N430WB RV-7 #74152, tip-up. Final assembly.

Log at: http://rv7.wbencze.com
Defeating gravity one rivet at a time
VAF 2019 donation happily made
Reply With Quote
  #25  
Old 09-15-2013, 11:56 PM
wjb's Avatar
wjb wjb is offline
 
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 924
Default There are wings here!

Getting a bit 'o help from the kidz .. they help flip the wings on the stand



Getting close to some serious pro-seal!
__________________
Bill Bencze
N430WB RV-7 #74152, tip-up. Final assembly.

Log at: http://rv7.wbencze.com
Defeating gravity one rivet at a time
VAF 2019 donation happily made
Reply With Quote
  #26  
Old 01-01-2014, 04:51 PM
wjb's Avatar
wjb wjb is offline
 
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 924
Default Progress 2013

Greetings and Happy New Year VAF friends,

My baby, N430WB, is proceeding nicely. 2013 saw the completion of the empennage, including the fiberglass work, and a significant amount of work on the wings. Frame is complete, tanks built and leak tested, LE riveted on and the top main skins are cleco'ed on a ready to rivet. Any folks in NorCal that wants to shoot or buck rivets, let me know. HAF is fog-free this time of year! (And, it's dungeness crab season -- come on down!)

340 hours on the Hobbs so far, including 92 for doing the tanks alone. I'm real comfortable with pro-seal now.

Here's my lovely assistant and resident wing flip helper showing off our handiwork:



Thanks to all for all the good info, advice, and encouragement via VAF ... it makes the build go so much easier.

-Bill
__________________
Bill Bencze
N430WB RV-7 #74152, tip-up. Final assembly.

Log at: http://rv7.wbencze.com
Defeating gravity one rivet at a time
VAF 2019 donation happily made

Last edited by wjb : 01-01-2014 at 09:10 PM.
Reply With Quote
  #27  
Old 05-19-2014, 10:25 PM
wjb's Avatar
wjb wjb is offline
 
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 924
Default The kids are getting it...

Ok, folks ... the fuse is on order and I'm recruiting the final bit of help to rivet closed the wings. Good progress!

So, in the lull, my youngest Genevieve took a particular interest in the build and, for a school project, decided to do a report on how to build an RV-7. Awesome; I did something right.

So, let's do it. She's already checked out on the monster back-rivet bar for the top skins, but she wanted to do the whole deal. Van's practice kit, here we come!















OK, Vans ... you got a builder for the RV-24 (surely a tail dragger!). You know where to send the check (or at least the discount on my finishing kit...)

I love it that the kids enjoy the journey too .. and learn a lot about how to build real things!
__________________
Bill Bencze
N430WB RV-7 #74152, tip-up. Final assembly.

Log at: http://rv7.wbencze.com
Defeating gravity one rivet at a time
VAF 2019 donation happily made
Reply With Quote
  #28  
Old 07-08-2014, 01:06 AM
wjb's Avatar
wjb wjb is offline
 
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 924
Default Fuselage time!

The wings are almost done and the fuse has entered the building. I figure I have a few more weeks of wing work to close up the right bottom skins, and then I can plow into the fuse kit. Lots more hardware in this kit than the wing kit.

Is it just me, or did anyone else find it a bit annoying that all the parts bags seem to be grab-bags of different combinations of AN hardware ? ... nuts, bolts, screws, washers.. I spent hours sorting them by size and type and put them in their proper bins on the shelf. At least the rivets were segregated into same-type bags!



Now, I need a place to store my wings so I have room to build the fuse. Any suggestions?
__________________
Bill Bencze
N430WB RV-7 #74152, tip-up. Final assembly.

Log at: http://rv7.wbencze.com
Defeating gravity one rivet at a time
VAF 2019 donation happily made
Reply With Quote
  #29  
Old 07-08-2014, 01:21 AM
xblueh2o xblueh2o is offline
 
Join Date: Apr 2011
Location: SF East Bay
Posts: 806
Default

This is what I did with the hardware.
Anything that is simple and common like nuts, washers, common length bolts etc went into parts bins. Anything that was special (long bolts, drilled bolts, rod ends etc etc etc) I left in the bags they came in and since Van's numbers the bags I placed the bags in a box in numerical order. When I need something I can quickly scan the packing sheet to find that the part I need need is in bag "X" and it is a simple matter of finding the correct bag.

Can you hang the wings from the ceiling?
__________________
Sam
RV-8 with the Showplanes Fastback conversion
Emp completed except for glass work
Wings completed except for bottom skin and glass work
Fuselage underway
N18451 reserved

Last edited by xblueh2o : 07-08-2014 at 01:23 AM. Reason: Typo
Reply With Quote
  #30  
Old 01-18-2015, 06:19 PM
wjb's Avatar
wjb wjb is offline
 
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 924
Default Full size fuse has entered the building!

Hi Folks,

I've been making good progress on my fuselage build and am happy to report a full length fuse in the shop. The firewall is clecoed in place. A pretty cool milestone, and that pile of blue coated aluminum is getting smaller and smaller. I'm very impressed on how well all the prepunched holes line up on this kit. Kudos to Vans for a great design.

The conical bends went perfectly, following a practice run on scrap. Amazing how ALL the holes line up!



Longerons bent, notched, and drilled to the skins:



Firewall attached in place:



And, a rare action shot of the chief pilot and bottle washer while riveting up the tail cone.

__________________
Bill Bencze
N430WB RV-7 #74152, tip-up. Final assembly.

Log at: http://rv7.wbencze.com
Defeating gravity one rivet at a time
VAF 2019 donation happily made
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 09:30 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.