VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics

  #1  
Old 08-27-2019, 09:23 PM
Mike.Smith Mike.Smith is offline
 
Join Date: Jun 2019
Location: Prattville Alabama
Posts: 43
Default N542TM RV-9A

I am just beginning. I bought a second hand kit that was previously started, but just barely. Step one is building the front spar of the HS. Can some of you with a more trained eye take a look at these stiffeners and tell me if this looks like ok work? I think it is, but I know nothing yet. It appears to me that the front and rear spars and stiffeners have been match drilled and thatís it. I added some photos of the stiffeners here, https://myeaa.org/?myproject&proj=7VvSW61l7&add

I would appreciate any opinions. If anyone one would like to see something else, let me know and Iíll add it. Thanks all.
__________________
Mike Smith
RV-9 Empennage (Beginning)
N542TM (Reserved)
Reply With Quote
  #2  
Old 08-27-2019, 10:20 PM
bruceh's Avatar
bruceh bruceh is offline
 
Join Date: Mar 2008
Location: Ramona, CA
Posts: 2,251
Default

Hard to tell from the photos, but it does look like the deburring of the holes is rather aggressive. They look slightly countersunk in some of the angles of the photos. It should be fine, I think.
__________________
Bruce Hill
RV-9A N5771H flown over 700 hours!
http://www.overthehills.com/RV-9A-Project
APRS Tracking for KJ6YRP and New Flying Blog
2019 VAF donator
EAA Tech Counselor
Reply With Quote
  #3  
Old 08-27-2019, 10:45 PM
Mike.Smith Mike.Smith is offline
 
Join Date: Jun 2019
Location: Prattville Alabama
Posts: 43
Default Photos

The light in the shop is harsh. Iíll try to get better ones tomorrow. Thank you for the reply, I hadnít even considered the deburring. It honestly feels like no deburring has been done, there are some pretty good edges on many of the holes. Another question, assuming the stiffeners or ok, is there any harm in making sure everything is match drilled by running a bit through them? Spars and stiffeners.
__________________
Mike Smith
RV-9 Empennage (Beginning)
N542TM (Reserved)
Reply With Quote
  #4  
Old 08-27-2019, 11:01 PM
PilotjohnS PilotjohnS is online now
 
Join Date: Jan 2016
Location: Southwest
Posts: 783
Default Just me

Instead of running a bit thru them, i think it would be better to place rivets in the holes. If the rivets fit in, great you are good to go. If they dont, then the holes have not been final drilled yet, or the doublers are not aligned properly.

Running a drill may figure eight the holes and make them too large in a critical location. JMHO
__________________
John S

WARNING! Information presented in this post is my opinion. All users of info have sole responsibility for determining accuracy or suitability for their use.

Dues paid 2019, worth every penny

RV9A- Status: tail feathers done less tips
Wings done less tips and avionics
Fuselage 30%
www.pilotjohnsrv9.blogspot.com
Reply With Quote
  #5  
Old 08-28-2019, 05:28 AM
Mike.Smith Mike.Smith is offline
 
Join Date: Jun 2019
Location: Prattville Alabama
Posts: 43
Default Good point

Thatís a good point. I had not thought of that either.
__________________
Mike Smith
RV-9 Empennage (Beginning)
N542TM (Reserved)
Reply With Quote
  #6  
Old 08-28-2019, 10:16 PM
Mike.Smith Mike.Smith is offline
 
Join Date: Jun 2019
Location: Prattville Alabama
Posts: 43
Default Airplane parts!

Tonight was the first time actually working on airplane parts. As I said upthread, I bought a secondhand kit and Iím still trying to figure out exactly where the other guy left off. I think I have it figured out now thanks to Bruce Hill, thank you for the help kind Sir! I have all the HS clecoed and I believe I know how to proceed. I have some drilling to do, deburring, priming then back together to start riveting. Feeling better. (No one remind me how long this is going to take)
__________________
Mike Smith
RV-9 Empennage (Beginning)
N542TM (Reserved)
Reply With Quote
  #7  
Old 08-28-2019, 11:30 PM
vernh59 vernh59 is offline
 
Join Date: Jan 2009
Location: Ozark, AL
Posts: 64
Default

Welcome Mike,
Im working on a second hand kit myself and, your right, you have to be careful. I replaced my HS spar and all attaching parts, tip ribs, and the left HS skin due to bad alignment, dents and holes where they don't go. My fuse kit is set to ship in October. Im looking forward to starting my own "new" kit so all the mistakes are MINE!!

http://www.vansairforce.com/communit...d.php?t=170479
__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete
Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 01:56 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.