VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics

  #1  
Old 12-03-2018, 06:30 PM
Bart Bart is offline
 
Join Date: Jan 2008
Location: Pecan Plantation (0TX1)
Posts: 133
Default Step 9-19 final close out

Just curious when people are actually placing the last 6 rivets on the left bottom skin to rear spar. The plans on step 9-19 say to leave open the last 6 but I can't see why or when they should be set and complete the close out. Is it for better access to place the foam ribs? If so, won't it damage the foam ribs setting the last 6 rivets?
Reply With Quote
  #2  
Old 12-03-2018, 07:07 PM
AlexC AlexC is offline
 
Join Date: May 2018
Location: Oviedo, FL
Posts: 14
Default

Hi Bart - I believe it is part of pg 09-22, step 2, in which you pull the bottom skin down to gain access to the shop end of two AN426AD3-3 rivets. You can substitute MK-319-BS at that stage ... and I highly recommend using blind rivets instead of cramming a bucking bar into the elevator to buck those two AD3-3s. If you use blind rivets, you can close out those other 6 rivets beforehand.

_Alex
__________________
Alex C.
RV-14A: Empennage mostly finished; Wing kit ordered
https://alex-rv14a.blogspot.com
Dues paid

Last edited by AlexC : 12-03-2018 at 07:14 PM.
Reply With Quote
  #3  
Old 12-04-2018, 12:17 AM
Mikeandmaz Mikeandmaz is offline
 
Join Date: Sep 2015
Location: England
Posts: 48
Default

Hi Bart,
Iíve just completed this stage, now waiting for Proseal to cure. I looked many times for instruction to complete the last 6 rivets you mention but couldnít find any. I just came to the conclusion that with all the rest of the Closeout completed and the next step inserting the foam ribs it was time to do it.
Happy building.
Mike
__________________
Empennage arrived
VS completed
Rudder completed
HS completed
Elevators completed
Quick Build wings, fuselage and finish kit ordered
#140425
Donation paid 2019
Reply With Quote
  #4  
Old 12-04-2018, 05:46 AM
Bart Bart is offline
 
Join Date: Jan 2008
Location: Pecan Plantation (0TX1)
Posts: 133
Default

Thanks fellas. Mike, I had to laugh at your response because my wife and I decided to do just that.
Reply With Quote
  #5  
Old 12-06-2018, 01:35 PM
Swiss14A Swiss14A is offline
 
Join Date: Feb 2018
Location: Switzerland
Posts: 3
Default +1

Hi Bart
Same here, just completed the step and closed it before glueing the ribs in. It is also listed in the list of common mistakes in the other thread (Plan Gottchas).
Cheers
Fabian
__________________
Alexandra & Fabian
RV14 HB-YAF, in progress
Reply With Quote
  #6  
Old 12-06-2018, 02:56 PM
JokerF22 JokerF22 is offline
 
Join Date: Feb 2016
Location: Phoenix, AZ
Posts: 10
Default

I went through that a few weeks ago. I spent SOOOO much time looking through the plans to find out where I was missing that step. In the end, I did the same as you all and riveted before gluing the foam ribs. I wish I could get that time back where I second guessed myself about a million times!
__________________
Active Duty USAF
RV-14A Empennage in Work (N410KA reserved)
https://rv14joker.blogspot.com/
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 03:29 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.