I'm just starting section 11 and was wondering if anybody had any tips on hanging the elevators. I'm understanding that they are more than likely going to have to come on and off multiple times but I'm struggling to get it on the first time let alone multiple times. Did people manage to do this solo or are multiple hands required? The cutout for the bearing in the elevator leading edge is very small and doesn't leave much room to get the hardware in.
If somebody had thought of an easy way to do this I'd love to hear it.
If somebody had thought of an easy way to do this I'd love to hear it.