Ok, I'm being lazy. I just started building a RV9A and the learning curve! I'm ready to rivet the nose rib on the vertical stabilizer to the front spar and there is nothing on the plans that tells you which side the manufactured head or the shop head should be. I recall reading something somewhere but rather than rereading everything I would be lazy and ask the experienced people here. Is there a rule that if not specified the manufactured head is on the front of the plane?
Thank you,
Darrell
Thank you,
Darrell