View Single Post
  #21  
Old 03-08-2018, 10:35 AM
Aircraft Specialty Aircraft Specialty is offline
 
Join Date: Jan 2012
Location: Oconomowoc, WI
Posts: 373
Default

I just wanted to give an update that due to the popularity of the rigid tube packages, we have taken steps to streamline our production. We now aim to keep several sets built and in stock. In the event we do run out, we are able to now build these on a 3 business day lead time. Wing rigid tubes are the same. The flex lines retain their standard 3-5 business day lead times. (More to come on all this including some new videos of a major shop upgrade we just completed related to rigid tube development.)

The current website message of reduced availability until 3-20 is NOT applicable to any of the RV-14 hoses and tubes.

Happy Building!
Steve
__________________
Steve Tschurwald- Aircraft Specialty LLC (Your source for Custom Parts for Experimental Aircraft), AS FLIGHTLINES (Joint Venture with TS Flightlines)

aircraftspecialty@gmail.com

www.aircraftspecialty.com
www.asflightlines.com

Last edited by Aircraft Specialty : 03-08-2018 at 10:53 AM.
Reply With Quote