mc607
Well Known Member
Wondering how 14 builders riveted the W-1010 rib to wing spar once the Torque Tube assembly is attached to it as per plans.
Did you reverse rivets so shop head was on 1010 rib flange?
Leave Torque Tube assembly off until rib installed, then rivet assembly to 1010 rib?
Other?
Thanks
Did you reverse rivets so shop head was on 1010 rib flange?
Leave Torque Tube assembly off until rib installed, then rivet assembly to 1010 rib?
Other?
Thanks