I have not riveted the baggage floor as in Canada we need a pre-closure inspection preformed. I have moved on to the next steps and got to the point of installing the rudder cables and the snap bushings. It was a lot easier to undo all the clecos and remove the floor than to twist my arm thru the lightening holes to install them. For those not to this point I would suggest looking ahead and install the snap bushings and perhaps push the rudder cables thru as well. Not saying it cannot be done as per plans.