View Single Post
  #8  
Old 08-02-2017, 09:17 PM
RFSchaller RFSchaller is offline
 
Join Date: Oct 2010
Location: Phoenix, AZ
Posts: 2,322
Default

If the operating limits issued for an ELSA don't address the ASTM standard is it (the ASTM standard) applicable to that airframe?

When I asked my DAR about night flying and IFR the response I got was that if properly equipped those operations are authorized. My Question:

Have you had a chance to see if my Op Limits can be changed to drop the day VFR limitation in phase 2 operations if equipped for night or IFR?


His response:

I had my discussion with MIDO and the reading is that after you sign off Phase I and are now operating in Phase II, Op Limit #10 becomes a mute point and #11 is in effect. You don't need to change your current limitations.
Reply With Quote