I read the note in the plans to look at the wiring before attaching the sides but didn't see the need to rout the wires before riveting. After riveting the sides on I then routed the wiring. Huge problem has I didn't realize some of the wiring is channeled along the longeron! Had to remove the Molex connector to fit it through the bulkhead. Does anybody else question the tightness of the cable running through the first bulkhead? I added a piece of protective plastic to keep the wires from chafing through sometime in the future.
I'd attach picture of the bulkhead issue except I don't know how to attach it.
I'd attach picture of the bulkhead issue except I don't know how to attach it.
Last edited: