VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Search Forums
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Showing results 1 to 9 of 9
Search took 0.01 seconds.
Search: Posts Made By: HHKing
Forum: RV-14 08-25-2018, 02:25 PM
Replies: 17
Views: 2,363
Posted By HHKing
Nose Wheel Leg Fairing

The plans say to check the pre-drawn lines on the lower portion line up with the center nutplate hole. Mine line up with the upper nutplate hole. Everything else seems to be lined up. Mine is...
Forum: RV-14 06-26-2018, 05:24 PM
Replies: 4
Views: 538
Posted By HHKing
Matco Master Cylinder Length

I installed my Beringer Master Cylinders after measuring the Matco ones. They measured 7 & 15/32". I think I called it 7 & 1/2 and put them in. Seems to be a good length.
Forum: RV-14 12-29-2017, 08:35 AM
Replies: 19
Views: 2,227
Posted By HHKing
Is FF-00084 in the firewall forward kit?

Is FF-00084 in the firewall forward kit?
Forum: RV-14 11-23-2017, 05:41 PM
Replies: 9
Views: 6,155
Posted By HHKing
QB Wings

Just put the Left Aileron on and I have contact by the skin on the 470 rivet heads. I think I may be able to file the skin to relieve the contact per 1) above. Really don't want to drill out those...
Forum: RV-14 11-23-2014, 07:39 AM
Replies: 29
Views: 9,879
Posted By HHKing
Rudder Nutplate Rivet Change Pg 07-05

Looks like they also changed the rivet callout for the bottom nutplate in figure 1 to AN470AD4-9 instead of -8's. I don't see any -9's in the Emp kit. Am I missing something. Tried the -8's but...
Forum: RV-14 11-18-2014, 10:29 AM
Replies: 4
Views: 2,191
Posted By HHKing
Fuselage

I will have to come by to see it. Thanks for the loan of the thin nose yoke on Saturday.:rolleyes:
Forum: RV-14 11-10-2014, 06:42 AM
Replies: 123
Sticky: Plan "Gottchas"
Views: 81,808
Posted By HHKing
Question Pg 06-04 Dimpling Question - Emp. Fairing Attach Locations

Do you dimple the places in VS-704, VS-705 & VS-801PP where it says LEAVE OPEN FOR EMPENNAGE FAIRING ATTACH, 6 PLACES ON EACH SIDE OF ASSEMBLY? I put tape over the holes and left them alone, but I...
Forum: RV-14 09-22-2014, 07:29 AM
Replies: 289
Views: 83,696
Posted By HHKing
Actually I have ordered a second tool box because...

Actually I have ordered a second tool box because I learned so much "the hard way" on the first one!
Forum: RV-14 09-21-2014, 02:54 PM
Replies: 289
Views: 83,696
Posted By HHKing
Smile SN 140187

Just got my invoice for S/N 140187 Tail Kit! Waiting for ABF to deliver & building some EAA 1000 benches. First Timer. (They need to change the registration form to allow selection of the 14 as an...
Showing results 1 to 9 of 9

 
Forum Jump

All times are GMT -6. The time now is 03:29 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.